Saturday, May 10, 2008

Construction, Part 10

The following were taken as progress was being made on our new patio. We used a natural stone set in a concrete base. The concrete is poured and then the stones are immediately laid into the concrete. Later, a "grout" is placed in the spaces between the rocks to give it a more uniform and level look.



As I mentioned before, I'm looking forward to the first night next to the firepit. Maybe I'll create my next blog entry next to the fire. OK, maybe not, but it sounds good.

1 comment:

Ray and Bev. said...

Dean and Maura, what a wonderful project! We love the tub and shower...just beautiful! And the work outside is absolutely great. Everything looks like it pulled together perfectly! Excellent designing. Can't wait to enjoy an evening with you around the fire pit this June! Love always, Mom and Dad